PROJECT:
Valero Control Rooms, Pembroke
BUILD COST:
CLIENT:
Valero Energy Corporation
MAIN CONTRACTOR:
Austwel
ARCHITECT:
WA Spees
Bullock Consulting were appointed by Valero to design and co-ordinate the refurbishment of the 3 control rooms at Pembroke Refinery, Wales.
Services provided included;
The work involved the replacement of all M&E services including HVAC systems and the installation of new acoustic ceilings and walls and a raised floor.
Bullock Consulting have produced a 3D animation of the proposed works for the PR control room to help the client understand the full extent of the works.
The control rooms have remained fully operational throughout the works which demanded close co-ordination and project planning but Bullock Consulting have successfully delivered all 3 control rooms to the satisfaction of the client.
The work commenced in 2012 and the final stage of the 3rd control room is scheduled to be completed in November 2019.