Bluestone National Park Resort appointed Bullock Consulting to refurbish the Energy Centre on the resort with new Biomass Boiler Plant.

 

Services provided included;

 

•Mechanical Design
•Site supervision
•Financial Management

 

The Energy Centre at the Bluestone Resort provides the site's main buildings with LPHW heating and domestic hot water.

 

The Energy Centre was originally fitted with two Talbot 1.5MW biomass boilers.  An energy audit was carried out on the site and it was discovered that the energy requirement and usage was much lower than first anticipated.

 

To reduce the running costs of the Energy Centre, the original biomass boilers were replaced for 2No ETA Hack 500kW Biomass Boilers & 2No 15000 litre hot water storage accumulators. 

 

Bullock Consulting were also appointed to make a Non-Domestic Renewable Heat Incentive application on behalf of Bluestone Resorts Ltd.